Construction Site Cleanup Services

Modular Concepts provides construction cleanup services across Massachusetts, Connecticut, and Rhode Island from our Marlborough headquarters. Crews follow the general contractor's schedule with a rough clean, a final clean before the punch walk, and a touch-up before turnover. Each phase is quoted on its own. Service after turnover is month to month, with no long-term contract.

Excellence in commercial cleaning icon, Modular Concepts
Cleaning scope icon: areas, frequency and tasks set for each project
Sustainability focus icon: green cleaning methods
Exceptional customer service icon, Modular Concepts
Since 2008Family-owned company operating since 2008
~8 YearsCustomers stay on average, with no contract
$2M InsuredGeneral liability, fully bonded
~100 StrongBackground-checked cleaning professionals
Three phases, set to your schedule

What Construction Cleanup Services Cover

Construction cleanup services cover the inside of a commercial project, from the last heavy trade to turnover. A rough clean clears heavy dust and light debris. A final clean details every room ahead of the punch walk. A touch-up follows the punch repairs.

The schedule belongs to the general contractor, so the phases follow it. Your superintendent calls each one when its area is ready. A final clean done too early only gets dusted again.

The superintendent gets a sign-off at the end of each phase. After turnover, the building can move to a monthly program with the same Modular contact. For the cleaning standard itself, see the post-construction cleaning page.

  • Sweep-out, with light debris bagged to your dumpster
  • Fine dust off ledges, sills, vents, and light fixtures
  • Casework, shelving, and counters wiped inside and out
  • Restroom fixtures, partitions, and mirrors cleaned
  • Labels and protective film removed from fixtures
  • Floors vacuumed and damp mopped, room by room
  • Elevator cabs, stairs, and the path the trades used
  • Touch-up in the rooms the punch list names
Three phases, each on its own line
Line on the quoteWhat it coversWhen it runs
Rough cleanSweep-out, light debris bagged, heavy dust removedAfter the heavy trades
Final cleanEvery room from the ceiling down, floors lastAhead of the punch walk
Touch-upDust and marks from punch repairsAfter punch repairs, before turnover
Add-on linesNew glass, a first floor finish, pressure washingOnly when the project needs them
Modular Concepts crew member dusting the top rail of a glass office front in a newly built suite
Final cleanLedges and frames first, floors last
A job site, not a finished building

Why Construction Sites Are Different to Clean

Construction sites are different to clean because the building is not finished, the dates move, and other trades are still inside. A job site has a superintendent, a safety plan, and a schedule that changes by the week.

Site rules come first. Crews attend the orientation, sign in, and wear the PPE the site requires. Parking, the hoist or elevator, and delivery hours are settled before the first phase.

Trades come back. A painter touches up a wall. An electrician opens a ceiling tile. Each visit leaves dust in a clean room. The touch-up phase is there for that, so nobody buys the final clean twice.

New finishes mark easily. Floor protection stays down until the superintendent releases it, and wet work waits for finishes that are still curing.

  • Orientation, sign-in, and badging before the first phase
  • PPE worn as the site requires
  • Each phase called by your superintendent
  • Touch-up held for the punch repairs
Nearly finished commercial corridor with floor protection, a stepladder, and blue tape marking punch list items
Punch listBlue tape marks where a trade still has to come back

Why Do General Contractors Choose Modular for a Job Site?

General contractors pick Modular for three reasons: phases set to their schedule, a certificate for each project, and one contact until turnover.

A project quote, not a long-term contract

Every project has its own quote, phase by phase. A monthly program after turnover runs month to month. Customers stay about eight years on average.

A certificate in the project file

General liability is $2,000,000 through Northeast Insurance. Workers' compensation is through Travelers. The certificate names the general contractor, the owner, or both.

Crews that follow your site rules

Everyone placed on site is background-checked. Crews attend your orientation and wear the PPE the site requires. The same assigned crew returns for each phase.

A written scope for each phase

Rough, final, and touch-up each get a line and a definition of ready. When the punch list grows, the quote shows what the touch-up covers.

SDO certified

The Massachusetts Supplier Diversity Office certifies Modular. On work paid for with state funds, that helps the project team meet its vendor rules.

Low-odor products beside occupied space

Green Seal trained crews switch to low-odor products when people work next to the renovation. Green cleaning is available on request.

Programs Construction Projects Add Before Turnover

The phase cleans are the core of the project. The other three are separate lines, added when the job needs them.

Three phases

Rough, Final, and Touch-Up Cleans

Every project needs cleaning at three points. The rough clean follows the heavy trades, so finish work starts in a clean space. The final clean details each room from the ceiling down, ahead of the punch walk. The touch-up returns after punch repairs. Buy one phase or all three.

  • Rough clean after the heavy trades
  • Final clean ahead of the punch walk
  • Touch-up after punch repairs
Modular Concepts crew member sweeping drywall dust from a concrete floor during a rough clean of a new suite
Rough clean: the sweep-out before finish work starts
New glass

New Glass, Frames, and Sills

New glass arrives with stickers, protective film, and a coat of jobsite dust. Modular removes the labels and film, then cleans the glass, frames, sills, and tracks. The work is timed after the painters and before the punch walk. Exterior glass above ground level stays outside this scope.

  • Factory stickers and protective film removed
  • Interior glass, frames, sills, and tracks
  • Entry glass at ground level
Modular Concepts crew member removing a factory sticker from new entry glass before cleaning the frames and sills
Stickers and film come off, then the glass is cleaned
New floors

First Finish on New Floors

A new floor needs to be cleaned and protected before it takes traffic. Modular scrubs new VCT and lays the first coats of finish once the installer releases the floor. Vinyl, tile, and epoxy get a machine scrub. The floor care program covers 750,000+ square feet a year, including carpet cleaning. Hard surfaces only: wood floors and polished concrete stay with their installers.

  • Scrub and first coats of finish on new VCT
  • Machine scrub for vinyl, tile, and epoxy
  • Floors done last in each area
New lobby floor with its first coats of finish in a commercial building just before turnover
First coats of finish on a new lobby floor
Outside, before turnover

Pressure Washing for Walks and Entries Before Turnover

Months of deliveries leave mud and tire marks on the way to the front door. Pressure washing clears entry walks, steps, and front pads once the fencing and trailers are gone. Dock aprons and the dumpster pad can join the same visit. New concrete is washed only after the contractor confirms it has cured.

  • Entry walks, steps, and front pads
  • Dock aprons and the dumpster pad
  • Scheduled once fencing and trailers leave
Modular Concepts crew member pressure washing a new concrete entry walk with construction fencing in the background
Entry walks washed as the site fencing comes down

How Construction Site Cleaning Starts

From the first site walk to turnover in five steps.

1

Walk the site with the super

The superintendent or project manager walks it with us, for about an hour. Floors, glass, access, and the turnover date are written down.

2

Quote each phase on its own line

Rough, final, and touch-up are priced apart. The quote says what ready means for each phase.

3

Set the certificate and site rules

The certificate names the general contractor, the owner, or both. Orientation, badging, PPE, parking, and delivery hours are settled before the first phase.

4

Clean each phase, then sign off

Your superintendent calls each phase when its area is ready. A sign-off ends each one.

5

Touch up, turn over, or stay on

The same crew returns after punch repairs. A schedule or drawing change updates the quote first. At turnover, a monthly program can begin.

A written, phased quote follows the site walkNo long-term contract. Each phase is priced on its own line.

How Much Do Construction Cleanup Services Cost?

Construction cleanup services are priced per project after a site walk, not from a posted rate card. Modular Concepts quotes the rough clean, the final clean, and the touch-up as separate lines across Massachusetts, Connecticut, and Rhode Island. Three things set the number: the areas in scope, how many passes each one needs, and the tasks each pass covers.

Walk the site first

The walk takes about an hour with the superintendent. Bring the drawings, the finish schedule, and the turnover date.

  • Drawings and finish schedule
  • Floor types, room by room
  • Glass, by amount and height
  • Access, hoist, and parking
  • The turnover date

Areas: what gets cleaned

The project is split into areas, so a phase can be released floor by floor.

  • Offices and open floor areas
  • Restrooms and break rooms
  • Lobby, corridors, and stairs
  • Elevator cabs and door tracks
  • Mechanical and storage rooms, swept
  • Walks and entries, priced apart

Frequency: how many passes

A project is counted in passes, not nights per week. The phases you choose and any return visits set this part.

  • Rough clean, one pass per area
  • Final clean, one pass per area
  • Touch-up, after punch repairs
  • Return pass when trades dust a room again
  • Day, evening, or overnight crews
  • Monthly program after turnover

Tasks: what each pass covers

Each phase has its own task list. A rough clean is sweeping and heavy dust. The final clean carries the longest list.

  • Sweep-out, light debris bagged
  • Fine dust off ledges, vents, and fixtures
  • Casework wiped inside and out
  • Restroom fixtures cleaned and polished
  • Floors vacuumed and damp mopped
  • First floor finish, priced apart

Your phased quote

Areas, passes, and tasks become lines. Each phase has its own price, and add-ons stay apart. A monthly program after turnover is its own number.

Your written quote areas, frequency and tasks, line by line
Rough cleanSweep-out and heavy dust, once drywall is finished
Final cleanEvery room from the ceiling down, before the punch walk
Touch-upNamed rooms, after punch repairs
Add-on linesNew glass, first floor finish, pressure washing
One project number Quoted per project. No long-term contract.

Steps advance on their own. Tap a hex to hold it.

Bring the finish schedule and the turnover date to the walk. The quote then lines up with the schedule, phase by phase.

Which Construction Projects Does Modular Clean?

Modular Concepts handles commercial construction cleanup from a one-suite fit-out to a ground-up building, across Massachusetts, Connecticut, and Rhode Island. The three phases stay the same. The site rules, the finishes, and the neighbors change.

occupiednew suitecorridor the trades usedoccupiedlobbyfreight pathNew suite in blue. Shared paths join if the trades used them.

Tenant fit-outs

One suite is built out inside a building that stays open. The suite gets the three phases. The corridor and freight path join the quote when the trades used them.

floor 3floor 2lobby and corenew glasswalks and entry padsphases releasedfloor by floorEvery floor in three phases. Outside work is an add-on.

Ground-up buildings

A new building puts every floor in play. Phases are released floor by floor as the trades finish. Walks and entries are an add-on once the fencing comes out.

exam roomswaitingequipmentrestroomsfirst floor finishafter opening: medical programRooms in blue. Equipment stays with its installer.

Medical build-outs

Exam rooms and casework must be free of construction dust before equipment arrives. Medical equipment stays with its installer. Cleaning after opening follows the medical program.

classroomsrestroomscorridor and stairsnew VCT: first finishRenovated wingexisting roomsshared hallgym floorExisting schoolThe renovated wing in blue. The shared hall can be added.

School renovations

Summer projects end on a date that cannot move, the first day of class. The renovated wing gets the three phases. A wood gym floor stays with its installer.

officesrestroomsbreak roomopen floor: scrubrackingdock apron: pressure washingOffice block in phases. The open floor is an add-on.

Industrial projects

The offices, restrooms, and break room in a new plant or warehouse get the three phases. The open floor can be machine scrubbed as an add-on. Racking stays with its installer.

occupied floorfloor under renovationoccupied floorlobbyelevator and pathevening or overnight passesOne floor in phases. The path the trades used can be added.

Occupied renovations

One floor is under construction while the others keep working. Crews use evening or overnight passes and low-odor products. The elevator and the route to the floor can join the quote.

Phase cleans on this quoteAdd-on, priced apartA Modular monthly programNot in scope

Debris hauling, dumpsters, demolition, and any hazardous material, lead, or asbestos work stay with the general contractor and its licensed vendors. Retail store build-outs are outside this scope. After turnover, an office project moves to the office buildings program.

What Project Customers Say

Modular has no general contractor review to show yet. These Google reviews are about one-time deep cleaning done to a date, quoted as written.

Sol Cohen

“I retained Modular Cleaning for a one time thorough, deep cleaning of a property getting ready to be sold. They were quite professional, and gave me a very accurate and detailed estimate. The cleaning was completed right on schedule, and was of outstanding quality.”

David LaBossiere

“We had retained Modular Cleaning to do a deep cleaning in a couple of our group homes before a state inspection. They did such a fantastic job that we have now retained them to do quarterly cleaning in all 4 of our homes as well as semi annual cleanings in our main office.”

Questions About Construction Cleanup Services

These answers are for the people running the job. For how each phase is cleaned, see the service page for the three cleans.

What do construction cleanup services include?

Construction cleanup services include three phases of interior cleaning, each quoted as its own line. The rough clean removes heavy dust and light debris after the main trades. The final clean details every room ahead of the punch walk. The touch-up follows the punch repairs. New glass, a first floor finish, and pressure washing are add-on lines.

How are construction cleanup services priced?

Construction cleanup services are priced per project after a site walk, with each phase as its own line. The areas in scope, the number of passes, and the tasks in each pass set the number. Floor types, glass, and site access change the crew time. There is no posted rate card and no long-term contract.

What happens when the turnover date moves?

When the turnover date moves, the cleaning phases move with it. Each phase is tied to a ready point, not to a calendar day. Your superintendent calls the final clean once the dust-making work is done. If a crew arrives and the area is not ready, the visit is rescheduled. Any added cost is agreed in writing first.

Do you haul debris or supply dumpsters?

No, Modular does not haul debris or supply dumpsters. Crews bag sweepings and light debris and carry them to the dumpster your site provides. Hauling, demolition, and any hazardous material, lead, or asbestos work stay with the general contractor and its licensed vendors. A crew that finds such material stops and tells the superintendent.

Do your crews follow our site safety rules?

Yes, Modular crews follow the site safety rules your superintendent sets. They attend the orientation, sign in, and wear the PPE the site requires. Crews have basic in-house safety training, and everyone placed on site is background-checked. If your project requires a specific safety course or card, raise it on the walk.

Can Modular keep cleaning the building after turnover?

Yes, Modular can keep cleaning the building after turnover on a monthly program. The project quote ends at turnover, and the monthly program starts as a new scope with the same contact. Service is month to month with no long-term contract, and the scope can change with 30 days notice. The janitorial services and commercial cleaning pages explain the nightly work.

Can the certificate of insurance name the general contractor?

Yes, the certificate of insurance can name the general contractor, the owner, or both, for each project address. General liability is $2,000,000 through Northeast Insurance, and workers' compensation is through Travelers. Modular is fully bonded. Ask for a copy for the project file. Each new project gets its own certificate.

Do you clean construction sites in Connecticut and Rhode Island?

Yes, Modular takes on commercial construction cleanup in Connecticut and Rhode Island, not only in Massachusetts. Project crews are sent from Marlborough, Massachusetts. They serve Connecticut job sites around Hartford and Rhode Island job sites around Providence. A contractor with jobs in more than one state keeps one Modular contact and the same phased quote.

Construction Cleanup Services in Massachusetts, Connecticut, and Rhode Island

Project crews leave our Marlborough headquarters for job sites in all three states, including Hartford and Providence. One contact can follow a contractor from job to job. The post-construction cleaning page explains the method for each phase.

Address 201 Boston Post Road West, Suite 204, Marlborough, MA 01752
Hours Mon to Fri: 6:00 AM to 9:00 PM
Sat: 8:00 AM to 12:00 PM
Sun: closed
Map of the Modular Concepts office at 201 Boston Post Road West, Suite 204, Marlborough, MA 01752

Massachusetts

Construction site cleaning along I-495, Route 9, and the Mass Pike, plus Worcester and Springfield. Crews start from Marlborough.

Connecticut

Connecticut job sites along I-91 and I-84, with Hartford as the main market. West Hartford, New Haven, Stamford, and Waterbury are quoted as routes allow.

Rhode Island

Providence projects along I-95. Cranston, Pawtucket, and East Providence job sites are quoted the same way.

Schedule a Walkthrough

Each phase priced on its own line, from rough clean to turnover. No long-term contract.

Meet the people behind Modular: Luiz Thomaz DaCosta, Owner and CEO, and Daniel DaCosta, Vice President of Operations.

Get a Free Quote

Tell us about your facility. A team member responds within 24 hours to schedule your free walkthrough.

No obligation. We never share your details.